Skip to content
Fremont CNC machine shop(510) 565-6461
CMM probe performing dimensional inspection on a machined component

Quality & inspection

Confidence should be measurable.

Quality is the working system behind the finished part: clear requirements, controlled processes, dimensional verification, and useful records when the program calls for them.

ISO 9001:2015 · ISO 13485:2016 · COORD3 CMM

Superior Precision MachiningFremont · California

Certified quality systems

Process discipline for demanding work.

Superior maintains quality management certifications aligned with general precision manufacturing and medical-device work. The applicable requirements are reviewed project by project.

ISO 9001:2015 certification badge

Quality management system

ISO 9001:2015

A structured quality management framework supporting consistent processes, customer requirements, corrective action, and continuous improvement.

View certificate
ISO 13485:2016 certification badge

Medical-device quality management

ISO 13485:2016

A specialized quality management framework supporting relevant medical-device manufacturing requirements and controlled production processes.

View certificate
Coordinate measuring machine used for dimensional inspection

Dimensional inspection

CMM capability for critical geometry.

Coordinate measurement supports controlled inspection of part features and relationships that are difficult to verify with hand tools alone. Inspection scope and reporting are defined around the drawing and customer requirements.

COORD3 Universal
CMM platform
Multi-sensor
Compatible system
Temperature
Compensation capability
Project-specific
Inspection planning

Inspection path

Quality starts before machining.

  1. 01

    Requirement review

    Identify critical dimensions, datums, notes, sampling, records, and any customer-specific expectations.

  2. 02

    Process planning

    Connect machining setups and in-process checks to the features that carry the greatest risk.

  3. 03

    Verification

    Use appropriate inspection methods, including CMM capability where it adds value.

  4. 04

    Documentation

    Prepare the agreed inspection records and package the finished work for delivery.

Start a conversation

Define inspection before the first setup.

Share the drawing, critical features, and required records with the RFQ so the machining and inspection plan can be built together.

Request a quote